Sign In | Join Free | My chinacsw.com
China Jinzhou City Shitan Machinery Equipment  CO. LTD. logo
Jinzhou City Shitan Machinery Equipment CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD.
Verified Supplier

5 Years

Home > Geological Drilling Rig >

620KG Water Well Borehole Drilling Rig

Jinzhou City Shitan Machinery Equipment CO. LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

620KG Water Well Borehole Drilling Rig

  • 1
  • 2

Brand Name : JINZHOU SHITAN

Model Number : ST-200

Certification : ISO

Place of Origin : China

MOQ : 1 set

Price : Negotiation

Payment Terms : L/C, D/A, D/P, T/T, Western Union

Supply Ability : 2000 sets per year

Delivery Time : 7-10 days

Type : Core Drilling Rig

Power Type : Diesel

Dimension(L*W*H) : 1820*980*1650MM

Weight : 620KG

Warranty : 1 Year

Contact Now

ST-200 Geological Drilling Rig Machine for Engineering Geological Exploration in Road and Railway Architecture

Borehole Drilling Rig Application:

ST-200 engineering drill is adopted with hydraulic pressure feeding structure, it can proceed attacking and gyrating drilling, and is used for engineering geological exploration in road,railway,bridge foundation,dam site,well,prospecting or industrial and civil architecture. It can also used in anchor rod engineering.

Borehole Drilling Rig Parameter:

Drilling Capability
Spindle Turnable Angle 0°~360°

Wire-line Core Drill Rods

BQ 245m
NQ 200m
HQ 160m
Rotary Table

Speed(r/min)

Forward 900 475 388 205 157 68
Reverse 256 85
Max Torque 2000N·m
Feeding Travel 400mm
Max Feeding Force 29KN
Max Lifting Force 39KN
3, Hoist
Bobbin Dia φ135mm
Rope Dia φ12.5mm
Bobbin Capacity 30m

Single Rope Hoisting Capacity

30KN
Single Rope Max Hoisting Speed(2nd Layer) (m/s) 0.27 0.64 0.83 1.58 1.64
4Oil Pump
Model CBF-F420-ALPLCBF-F420-ALPL Gear Pump
Displacement 20mL/r
Nominal Speed 2500r/min

Nominal Pressure

20MPa
Max Pressure 25MPa
5 Engine

Model

Power

Speed

Weight

(1) Electro-motor Y160L-4 15KW 1460r/min 144kg

(2)

Diesel Engine

ZS1110

CHANGCHAI ZS1110

14.7KW 2200r/min 180kg
Frame
Type: Sliding(with sliding frame base)
Rig Travel 400mm
Distance Away from Hole 270mm
7Dimension(L*W*H) 1820×980×1650mm

8,

Rig Weight(without engine)

750kg

There are seven points for attention in the construction process of Borehole Drilling Rig

1. The operators of water well drilling rig shall be trained and qualified and take up the post with certificate.

2. The equipment entering the site shall meet the construction requirements, and the trial operation test shall be conducted before the formal start-up of the well drilling rig, and the operation status shall be stated in time.

3. The specific drilling process should be prepared, the operation rules and standards of water well drilling equipment should be prepared, and the construction records should be made.

4. During the drilling process, it is not allowed to rotate until the planned elevation is reached. Maybe if the drill pipe needs to be rotated or raised under special circumstances, the drill pipe should be lifted to the surface, and the bit valve should be dredged and closed from the beginning. The operator should strictly control the descent speed and rotation speed of the threaded bit.

5. Before drilling, carefully check whether the air hole at the top of the core pipe is smooth, whether the concrete delivery hose joint is outstanding, and whether there is distorted appearance.

6. In the process of hole forming, when the drill pipe is found shaking or the footage is slow, the footage should be slowed down to avoid pile hole deflection, displacement and damage of drill pipe and drilling tool.

620KG Water Well Borehole Drilling Rig


Product Tags:

620KG Water Well Borehole Drilling Rig

      

ISO Water Well Borehole Drilling Rig

      

ST200 borehole drilling equipment

      
Quality 620KG Water Well Borehole Drilling Rig for sale

620KG Water Well Borehole Drilling Rig Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jinzhou City Shitan Machinery Equipment CO. LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0